M5: the cost proof's assumptions for the proof parameters (CostSetup) #
The game has n_f = 1 + 2⌊N/(θ + 1 − c_max)⌋ counters and runs rounds of length
R_f = ⌊J/reservationBudget⌋ + 1, where J = 13H + 2 bounds a top-structure job.
The game's counter count.
Equations
- OrderMaintenance.Proof.Top.nfP P = 1 + 2 * (P.N / (P.theta + 1 - OrderMaintenance.Proof.cmax P))
Instances For
The game's round length.
Equations
Instances For
The chunks have room: θ + 1 − c_max ≥ 8.
The game's counters, beyond the first, are fewer than 2^(L-2).
H_m + 1 ≤ L for the game's counters.
I5 for the proof parameters.
The tree holds the chunks.
The preparation budget: H(N') + 1 ≤ L(N) + 2 for N' ≤ 4N.
Small capacities: L + 6 ≤ N/2 for N ≥ 64.
The core's correctness conditions for the proof parameters.
Theorem A for the proof parameters (Level F): the structure never fails and answers as the specification.
The wrapper's cost theorem for the proof parameters (Level F), with no assumptions left: the cost invariant holds initially and after every valid operation, so every core insertion takes no FALLBACK and a bounded amount of background work.